The Lujiang Photovoltaic Power Station project is located in Baihu Town, Lujiang County, Anhui Province, with a design capacity of 20 MW photovoltaic distributed power generation project. The power station has a daily power output of 100,000 kWh and an average annual power output of about 21 million kWh. It can save 3514 tons of standard coal and reduce 8.43 million tons of carbon dioxide emissions. The smooth grid-connected power generation of the power station project will help optimize the structure of the energy industry in Anhui Province, increase the proportion of clean energy supply, promote the green, environmentally friendly, and sustainable development of Anhui's economy, benefit the local people, and have an important historical and practical significance in advancing the construction of beautiful Anhui.